Materials List: Fast Track Factory:
Using the Engineering Design Process to Improve Efficiency in Mass Production

Each group (recommended 8-10 students each) needs:

For the entire class:

  • 1 laptop or computer with projector to display instructions, videos, and time/timer
  • designated testing area with materials for ramp and drop tests (Note: The teachers who contributed to this activity created relatively elaborate versions. The associated activity images do not reflect how these materials must appear. Testing areas can be made from a wide variety of sloped and elevated surfaces, depending on classroom setting and materials available.) See Teacher’s Quality Testing Equipment Presentation
  • Mass Production Presentation teacher script
  • cardstock for Activity Station Place Cards
  • (optional) Exit Slips (1 per student) 
https://www.teachengineering.org/activities/view/uol-3007-fast-track-factory-mass-production-activity